Riverport Pier Bulkhead & Fender System Improvements

  • Replace ~1,100’ of existing timber and steel bulkhead with new rip-rap and sheet pile bulkhead. Installed piles, pile cap, and floating fender system for 425’ pier.
  • Removal of existing wood & steel fender & pile. Replaced with new floating fender, pile and pile cap.
Scroll to Top